From Meralco Bill to Solar Installation

1Bill2Design3Install4Switch on

Going solar can feel like a big project, but it follows a clear, predictable path. Here's exactly what happens from your first enquiry to the day your system switches on.

1. Share your bill

It starts with your latest Meralco bill or your monthly kWh. That tells us your usage pattern and lets us size the right system and estimate honest savings — no site visit needed for a first quote.

2. Design & proposal

We size the array, inverter, and (if you want backup) the battery, then prepare a proposal with clear pricing, savings, and payment options. A site assessment confirms roof condition, orientation, and shading before anything is finalised.

3. Paperwork & approvals

For grid-tied systems, we handle the net-metering application with Meralco and any local permits. This is the part most homeowners dread — so we manage it for you.

4. Installation & switch-on

The physical install of a typical home system takes one to three days: mounting rails, panels, inverter, and wiring. After inspection and commissioning, your system is energised and you start saving from day one.

The bottom line

From bill to switched-on is four clear steps, and we handle the permits and net-metering paperwork for you. Most home installations are complete within a few days once approved.